1、in order to ensure the generator main switchboard power supply during debugging, on the bus and distribution panel on the generator bus apart, the obstruction of the main switch work of suspended chain circuit.If you don't need power supply other load on board equipment, the work can not do, 440 v insulation table had better take off or turn off the fuse.And check control drawings witchboard wiring is correct.
2、good distribution of generator load equipment, (usually resistance and water resistance and reactor respectively do the perceptual load) and make it work.With temporary cable will load equipment connected to the generator bus bar on the screen.
3、easy to debug in the generator and bus-bar indirectly into a three-phase isolation switch and a voltmeter.
4、check the generator transformer part of cold insulation resistance, should be in more than 2 m.And quote us distribution board clean.





http://www.shunmarine.com
Taizhou Shunfeng Industry&Trading CO.,Ltd
Overseas Market Sales Dep.
Tel:+86-523-82386691
Fax:+86-523-86225700
Mob:+86-15189919053
Skype: johnson8528
E-mail: info@shunmarine.com
Contact Us:info@shunmarine.com